- Rotor dynamics
- Performance trial ( PG test )
- Proposal / Feasibility check
- Site support activities
- FEA and CFD Analysis
- Foot print replacement turbines
- Specifications for Balance of Plants Like Gland Sealing station, Lube oil system, Governing system, Coupling, Generator etc.
- Erection and Commissioning
- Convert all Thermal calculation in to Design Drawings & Documents to meet the design requirements.
- Indigenization of imported components for turbine assy. and improve the existing components based on feedback.
- Design & Drawing of Turbine components
- Material specification and Inspection & Test Requirements
- Manufacturing Support to vendor, OM & Purchase, including material swapping
|